Your building is nearly finished. The consultants have signed off. Integrated systems testing is complete. Everyone is talking about move-in day. Now the building inspector is coming. In Episode 50 of What the RFI?, we’re talking about one of the biggest milestones in Construction Administration: the occupancy inspection. What happens when the Authority Having Jurisdiction (AHJ) arrives on site? What is the building inspector actually looking for? Who should attend the inspection? And what happens when the inspector finds something standing between your project and an occupancy permit? This is Part 3 of our four-part Occupancy & Project Closeout Series. 🏗️ IN THIS EPISODE What AHJ — Authority Having Jurisdiction — actually means Who may be involved in an occupancy inspection Why the occupancy process varies between municipalities When to start communicating with the building inspector Why occupancy day should NOT be the first time you meet your inspector How to perform your own pre-occupancy walkthrough Exiting, egress and life-safety requirements Accessibility items inspectors may review Fire department requirements and inspections Who should attend the occupancy inspection What to do when the inspector identifies something unexpected Why arguing with the AHJ on site usually isn’t the answer How to document and close inspection deficiencies Re-inspections and follow-up reviews Partial and conditional occupancy Getting to the final occupancy approval One of the biggest lessons from this episode? Walk the building BEFORE the inspector does! Forget about the paint touch-ups for a moment and put on your building-inspector hat. Follow the path of egress. Open the doors. Check the hardware. Look at accessibility. Look at guards and handrails. Look at fire separations and fire department access. Make sure the building’s life-safety systems are actually ready. And when the inspector finds something — because they probably will — don’t panic. Understand the concern. Document it. Assign it. Resolve it. And keep the project moving toward occupancy. CHAPTERS 00:00 — The Building Inspector Is Here 00:20 — Welcome to What the RFI? 02:00 — What Is an AHJ? 03:30 — Know Your AHJ 04:46 — Don’t Meet the Inspector on Occupancy Day 07:24 — Walk the Building Before They Do 08:49 — What Will the AHJ Look For? 10:29 — Fire Department Review 13:05 — Occupancy Inspection Day 16:03 — Before the AHJ Leaves 18:03 — Unexpected AHJ Deficiencies 20:05 — Closing the Deficiencies 23:00 — Partial & Conditional Occupancy 25:02 — Final AHJ Review Tips 27:01 — Don’t Celebrate Yet! 🎧 OCCUPANCY & PROJECT CLOSEOUT SERIES This is Part 3 of a four-part What the RFI? series following a construction project through occupancy preparation, integrated systems testing, the AHJ inspection and ultimately project closeout. PART 1 — OCCUPANCY PREPARATION What needs to happen before you can even think about calling for an occupancy inspection? https://youtu.be/HDiwBEi4oHY PART 2 —...
1:00:03(knocking) Knock, knock.
1:00:07Who's there?
1:00:08Ah, the building inspector.
1:00:11Shit.
1:00:13Coming.
1:00:14Let's get into it.
1:00:16(upbeat music) Welcome to What the RFI.
1:00:21I'm Matt Brennan, and this is the podcast all about CA.
1:00:24So we're picking this up from episode 49, which was the S-1001 testing.
1:00:30This is our third part out of four series, talking about how to go from Octomy Prep to closing out and getting that final octomy scene, right?
1:00:42So definitely take a look at the links below.
1:00:46And of course you can watch the previous episode, the link above here, and then again, we'll get you all figured out.
1:00:50But the reality is we're doing this whole series to go into it.
1:00:53So like I said, the first one was all about the Octomy Prep.
1:00:56The other episode was the S-1001, integrated testing, what that day of life would look like.