What happens after the fire alarm goes off? Does the elevator recall? Do the doors release? Do the mechanical systems respond? Does the monitoring station receive the signal? In Episode 49 of What the RFI?, we continue our four-part Building Occupancy Series with a practical look at CAN/ULC-S1001 Integrated Systems Testing from the Construction Administrator’s perspective. We break down what S1001 testing is, how it differs from fire alarm verification, who needs to be involved, how to prepare for testing day, and what happens when one of the building’s integrated fire and life-safety systems doesn’t respond the way it should. We also discuss the S1001 Integrated Testing Plan, coordinating contractors and consultants, common testing-day failures, retesting, deficiencies, and the final S1001 documentation needed as you work toward building occupancy. In this episode: What CAN/ULC-S1001 Integrated Systems Testing is S1001 testing vs. fire alarm verification How fire alarm, elevators, doors, HVAC/BAS and other systems interact Who should be involved in integrated systems testing Preparing the building before testing day Coordinating trades, consultants and technicians What happens when an S1001 test fails Retesting and documenting deficiencies Final S1001 documentation for building occupancy Construction Administration lessons for keeping occupancy on track Chapters 00:00 Fire Alarm Test — Does Everything Work? 00:39 S1001 Integrated Systems Testing 02:21 What Is CAN/ULC-S1001? 03:56 How Integrated Life-Safety Systems Work 05:41 S1001 vs. Fire Alarm Verification 07:09 Who Is Responsible for S1001 Testing? 10:34 The S1001 Testing Plan & Checklist 11:19 Before Testing Day — Don’t Use S1001 for Commissioning 12:45 Coordinate the Right People 15:31 S1001 Testing Day 19:30 Expect Something to Fail 21:29 Document Deficiencies & Retesting 22:40 Final S1001 Report for Occupancy 23:44 Construction Administrator Takeaways 25:17 S1001 Complete — What’s Next? This is Part 2 of our four-part Building Occupancy Series, following Episode 47 on Building Occupancy Preparation. Next up: the AHJ is coming to site. We’ll look at the final occupancy inspection, what the Authority Having Jurisdiction may be looking for, and what happens when the inspector finds something you weren’t expecting. What the RFI? is a Construction Administration podcast for architects, engineers, consultants, contractors, owners and project managers working through the realities of construction. Got an RFI for Matt? Send it here! 🎙️Website - WhattheRFI.com 🍏Apple Podcast - What the RFI? 🎧Spotify - What the RFI? 🎥YouTube - @WhatTheRFI
1:00:00(alarm ringing) Okay, the fire alarm works.
1:00:04Can we turn this off now?
1:00:07Much better.
1:00:09Well, we know the fire alarm works, but did the doors unlock?
1:00:15Did the elevator recall?
1:00:17Did the mechanical system shut down?
1:00:19Did the dampers close?
1:00:20Did the monitoring company actually get the signal?
1:00:24Because getting the fire alarm to make a whole bunch of noise is only part of the test.
1:00:29Today, we're talking about the S1000 wine integrated testing.
1:00:33Let's get into it.
1:00:35(upbeat music) Welcome to What the RFI.
1:00:40I'm Matt Brennan, and this is the podcast all about CA.
1:00:43So we're on this journey together to do basically a four-part series about all the way from your occupancy prep all the way to getting that actual occupancy permit.
1:00:53And there's a whole bunch of steps that are needing to go through this.