The Mass Timber Podcast: Explore Mass Timber industry conversations · Brady & Nic
Mass timber projects don’t succeed because of one company, but entire ecosystems. Erich Roden retired as a Deputy Chief of the Milwaukee Fire Department after 34 years and now runs Murphy Roden Group. He served on the UL Fire Safety Research Institute and the Wisconsin Mass Timber Task Force that built the variance pathway for the Ascent. Mason Brandt is President and Principal Engineer of WoodCore Engineering, with 25+ mass timber projects designed. Together they break down where fire service skepticism comes from, what fire performance actually requires at the connection and member level, how the Ascent in Milwaukee got pulled from concept phase to the world's tallest mass timber building at completion, and what's shifting in East Coast markets, including FDNY's move from a flat "no" to running a mass timber primer in their own trade magazine. This episode explores fire safety in mass timber and how collaboration between engineers, architects, developers, manufacturers, and fire departments makes projects like the Ascent possible. Find New Projects & Partners at the Mass Timber Group AEC Convention Grow your mass timber network. Join our newsletter
0:33SPEAKER_00Today's episode is a conversation between two people who spent their careers on opposite sides of that table.
0:38SPEAKER_00Eric Roden spent 34 years in the fire department, finishing as a deputy chief.
0:42SPEAKER_00He served on the UL Fire Safety Research Institute, where they burned a lot of CLT, and he sat on the Wisconsin Mass Timber Task Force that helped build the various pathways for the extent, the tallest Mass Timber building in the world at the time.
0:55SPEAKER_00Mason Brandt is the president of Woodcore Engineering with 25 plus Mass Timber projects under his belt.
1:00SPEAKER_00And in this episode, he's the engineering voice on what fire performance actually requires at the connection and member level.
1:06SPEAKER_00So here's what we covered.
1:07SPEAKER_00For design and engineering teams, connection detailing and how the tar rate drives member sizing and why exposed steel is the failure point that keeps fire marshals up at night.
1:16SPEAKER_00For developers and owners, using the extensive story is a blueprint.
1:20SPEAKER_00New land development brought the Milwaukee Fire Department into the conversation in the initial concept phase.
1:25SPEAKER_00And Eric breaks down exactly what that process looked like and why it's the reason the building got built the way it did.
1:31SPEAKER_00And for anyone taking mass timber into a new market, what's shifting with major metro departments like New York State?
1:37SPEAKER_00Why East Coast project pipelines are now almost double or triple that of West Coast?
1:41SPEAKER_00And what fire departments in unfamiliar markets actually need to see before they're comfortable staying yet.
1:46SPEAKER_00Because as Eric would say, fire departments aren't gatekeepers.
1:49SPEAKER_00They just want to be brought in early, shown the data, and convinced that their ability to fight fire won't be compromised.
More The Mass Timber Podcast: Explore Mass Timber industry conversations episodes →