Mass timber projects don’t succeed because of one company, but entire ecosystems. Office buildings in major U.S. metros are sitting at roughly 20% vacancy. Data centers? Less than 1%. The U.S. is building data centers at a pace the construction industry has never seen, and for the mass timber world, that's a real opportunity. Erik Barth is a Senior Associate at Gensler in Boston, where he leads the firm's Mass Timber Collaborative. In this episode he breaks down where mass timber fits in the data center boom, why Type III construction has become the sweet spot (not Type IV), how his team handles the structural loads of high-density equipment with a five-ply CLT panel on a steel primary system, what's shifting in cooling tech and code, and why committing to mass timber up front is the difference between projects that work and ones that don't. If you're exploring mass timber for your own projects, one of the first questions is often “who actually makes the materials?” To help with that, we created a Mass Timber Producer Map featuring 39 North American producers and fabricators. You can explore manufacturers near your project, see the products they produce, visit their websites, and connect directly with them. Find New Projects & Partners at the Mass Timber Group AEC Convention Grow your mass timber network. Join our newsletter
0:00SPEAKER_01It's kind of a an ending demand at this point.
0:03SPEAKER_01You know, the vacancy rate of data setters is less than one percent.
0:07SPEAKER_01You know, whereas you look at office buildings, and depending on what your s what city you're in in the US, it's 20%.
0:12SPEAKER_01So it the demand is pretty remarkable.
0:15SPEAKER_01So the mass timber sustainability and just the story in general about around mass timber is very strong.
0:20SPEAKER_01And when you apply that to a project type like a data center, it becomes a really significant opportunity.
0:29SPEAKER_01Because mass timber can be assembled very efficiently in a prefabricated manner off-site, and it can be then brought on site and can significantly reduce construction schedule.
0:41SPEAKER_01It creates, compared to steel or concrete, a pretty tremendous opportunity to get a whole bunch of square footage built much faster, which is needed for the associated demand with data centers.
1:13SPEAKER_00Some are much higher.
1:15SPEAKER_00Data centers, less than 1%.
1:18SPEAKER_00Right now, the US is building data centers at a pace that the construction industry has not seen before.
1:23SPEAKER_00Spending has more than tripled in the last three years, and no other commercial real estate category is even close.
1:29SPEAKER_00So what does that mean for the mass timber world?
1:31SPEAKER_00A real opportunity, if we can get it right.
1:34SPEAKER_00The carbon map is there.