From 1928 to 1930, crews built a highway tunnel beneath the Detroit River using steel, concrete, dredging, and compressed-air excavation. One 500-ton tube nearly toppled when its timber supports failed. The workers regrouped, lowered nine steel sections into a riverbed trench, joined them underwater and connected them to tunnel approaches on both shores. Hear how welders, tugboat crews, divers, and tunnel workers helped build the Detroit-Windsor Tunnel, which opened to traffic on Nov. 3, 1930. The End of the Road in Michigan is a production of Thumbwind Publications This episode includes AI-generated content.
0:00In late November 1928, a steel tube about 220 feet long and 31 feet in diameter stood on timber
0:08launchways near Ojibwe, Ontario. It weighed about 500 tons. Rookers had built it to become part of
0:15a new road tunnel beneath the Detroit River. Men were on the structure as hydraulic jacks began
0:21to move it toward the water. The tube started forward, then the timber cradles failed. The steel cylinder
0:28dropped onto the broken launch supports a few feet from shore. Rookers escaped without injury
0:34and an inspection found the tube undamaged. The mishap was a hard opening act for a project that
0:41would ask crews to build nine steel sections, lower them into a river trench and join them into one
0:47passage between two countries. The idea had been debated for decades. A railway tunnel already
0:54ran beneath the river, but cars needed a crossing of their own. By the 1920s, the automobile had
1:00changed travel on both sides of the border. Ferry service still carried people and vehicles across
1:06the river. Detroit and Windsor wanted a direct route for motorists. Construction began in 1928.
1:13The engineering firm Parsons Clap, Brinkerhof, and Douglas designed a 5,160 foot tunnel.
1:21Its route would use three methods. Crews would excavate open trenches near the entrances,
1:27drive shield sections through the clay under compressed air and sink prefabricated steel tubes
1:32across the riverbed. The underwater tubes were only one part of the project, but they were the