Just as crews began repairing sections of M-119 (also known as The Tunnel of Trees) damaged by April flooding, heavy rains in June wreaked havoc on more sections of the popular tourist route in Michigan's northern Lower Peninsula. Following completion of a $300,000 project to stabilize the slope beneath a section of M-119 near West Stutsmanville Road damaged in the spring flooding, the Michigan Department of Transportation (MDOT) announced in early September that it has reopened M-119 between West Stutsmanville Road and Terpening Road. This map shows current status and detour routes. On this week’s edition of the Talking Michigan Transportation, an update from MDOT North Region Engineer Bill Wahl on work that’s been completed on M-119 and what long-term challenges remain for the corridor. He also talks about some of the other roads in MDOT's North Region damaged in the spring flooding. Finally, Wahl offers details on construction of a diverging diamond interchange (DDI) at the I-75/M-32 intersection in Gaylord. The first such interchange to be built in northern lower Michigan, a DDI is an alternative interchange that improves safety, increases traffic flow and can reduce construction costs.

Sep 172026
32 minlength
294transcript lines
Publishertranscript source

Transcript first 15 of 294 lines

0:07Jeff CransonHello, welcome to the Talking Michigan Transportation Podcast.

0:10Jeff CransonI'm Jeff Cranson.

0:12Jeff CransonThis week I wanted to catch up on what's going on with the iconic tunnel of trees, which is also M119, a state route in northern Michigan.

0:24Jeff CransonMany people across the state are familiar with it.

0:27Jeff CransonIt's one of those things kind of like the Dune Climb or Mackinac Island the Taqhuamenon Falls that everybody does as sort of a rite of passage if you grow up in Michigan or even from neighboring states.

0:40Jeff CransonIt was badly damaged by some heavy rains and flooding in the spring.

0:45Jeff CransonAnd then just when MDOT crews thought they were going to be able to get things back in order, another deluge hit in June and really wreaked havoc on many sections of the route.

0:56Jeff CransonSo following completion of a $300,000 project to stabilize one of the slopes beneath a section of the road near West Stutsmanville Road, MDOT in early September reopened that segment between Stutsmanville Road and Turpening.

1:12Jeff CransonI wanted to talk to Bill Wahl, who is the North Region Engineer for MDOT and was previously the Associate Region Engineer and was heavily involved in overseeing this and trying to make some decisions and a lot of public engagement with people, business owners, uh especially who are affected by the road being closed, washed out.

1:34Jeff CransonSo he had a lot of really good things to say about what's happened and what's going to need to happen going forward, including a study, some real hard look at what the cost is going to be and what's even doable to restore some of the sections that are on bluffs that just can't really be stabilized in any traditional ways.

1:56Jeff CransonHe also talked a little bit about the Diverging Diamond Interchange that's going to be built at M32 and I-75 in Gaylord, which is a huge deal.

2:05Jeff CransonIt's the first time one of those innovative interchanges has been done anywhere in the northern part of the state.

2:11Jeff CransonSo that was an interesting discussion too.

2:13Jeff CransonI hope you enjoy what Bill had to say.

2:16Jeff CransonSo once again, as mentioned in the introduction, I'm talking to Bill Wahl, who is newly ensconced as the North Region engineer for MDOT.

More Talking Michigan Transportation episodes →