#110 — Why Digital Signalling Never Got Cheaper, with Andy Harrison

Twenty years ago the promise was simple. Digital train control would get cheaper, and ETCS and CBTC would become the default for every new scheme. Neither happened. Costs keep rising, and the system knowledge keeps migrating into the supply base. My guest is Andy Harrison, a long-time friend and consultant to top railway clients across Great Britain, with four decades in the industry. We get into why the tipping point never came, what changes when the railway no longer holds competence in its own systems, why "change management" is far more than a new job description, and why zero disruption should be the default for bringing new signalling into service, not the exception. Subscribe to the channel "Railway Conversations with Doc Frank" on your podcast platform of choice (YouTube, Apple, Spotify) to get notified first. If are interested in deeper understanding of modern train control, visit my training portal at www.docfranktraining.com. There you find the most comprehensive suite of online courses in advanced railway signalling anywhere. CBTC, ETCS, high capacity signalling, and more. All in one place, all vendor neutral.

Jul 292026
35 minlength
49transcript lines
Publishertranscript source

Transcript first 15 of 49 lines

0:04Andy Harrison, welcome to the conversation.

0:07Hi Frank, it's good to see you.

0:09Thanks very much. We had a bit of a pre-talk a couple of minutes ago and you said something that the signalling industry has changed quite a bit, which is by the way something that I noted as well. What do you mean by that? How do you see the recent changes that we are seeing in the industry?

0:28I think it's, in all the years that we've been working in railway signalling, and personally that's almost 40 now, I was expecting to see over that period of time the application of the ERTMS, ETCS, CBTC systems to become much more widespread and to become almost the de facto standards for new signalling schemes across the world, for costs to have reduced, for life cycle support costs to reduce. And I think in my recent work with clients, I'm not really seeing that. I'm seeing the cost of signalling installations continue to rise, both in the UK and in other places.

1:10And I'm seeing a real nervousness within railway authorities about taking on life cycle support costs for these high technology systems, which have very different maintenance requirements, very different obsolescence management requirements, than existed previously with the technology that we've previously used.

1:30And so I think the worry I have is that we're working very hard to create some extremely interesting technology to support improved signalling, but perhaps we're not doing it in a way which is very cost effective, very deliverable, and very maintainable over the life cycle of the system. And as a result, actually, railway authorities, and more importantly, passengers, the freight companies, are not getting the benefits that the improved signalling systems can provide. And I worry, I think, that I don't see a tipping point where that cost increase changes to become a cost decrease. What are your thoughts?

2:10Yeah, well, definitely the costs of projects go up. And I also noticed that I think it has a lot to do with the mindset of the clients still being stuck in the old ways of doing things and the old technology. So for example, one thing which I think has to change significantly with digital systems such as ETCS or CBTC is the relationship between the client organisation and the supplier organisation. You can't just say, ah, I buy three more widgets, like two signals and one point machine, and then I can kick the supplier out. And if anything happens, then I go to another supplier and buy three other widgets from them. So with a system like CBTC, where the single point of responsibility for design, for design changes, for obsolescence management, for all these things sits with the supplier, the client needs to have a long-term, almost like a partnering relationship with the supplier. So basically as some kind of technology partner. But that's an approach that was never used, that was never needed in conventional signalling. And this is a mind shift that client organisations have to do, which seems pretty obvious for you or me, because we have the perspective of many other projects elsewhere.

3:47But even if we try our best to convince client organisations as consultants, that this is how it needs to be, they listen, but they can't get their head around it. That's my impression anyway.

4:01It's a really valid point I think you're making. The whole issue of partnership is becoming, I think, much more obvious in the industry now. I think people are starting to wake up that instead of having a short-term particular delivery contract for a particular scheme or a particular route, what's required now is a long-term relationship between the railway authority and the supply company, both for the delivery, but also for the management of that system through its life.

4:33And that's a fundamental shift. Railway authorities used to, and that's true for many technologies which hold maintenance responsibility, first-line maintenance responsibility, particularly. For a lot of these modern technologies, that's simply not appropriate anymore. So the railway authority is changing the fundamental nature of the way it maintains to the railway because it's actually contracting out to the supplier of the system over perhaps 15, 20, 25, or 30 years. And more than simply first-line maintenance, making sure that the system is performing and is available as required. It's a supply chain issue that's component changes, component unavailability over the life cycle of the system. And obsolescence, simply obsolescence management. In 10 or 15 years, the base components of a lot of the systems that we're dealing with, they'll be no longer available. And that obsolescence management approach needs to be fundamentally different. So I think you're right. It's kind of my summary of that. The change from a contract-driven environment to a partnership-driven environment, just clearing the way forward for a lot of these technologies. Yes. And one additional aspect. So I subscribe to everything you just said. Obsolescence management is a huge challenge for these kinds of systems and it does require a long-term support by the contractor. But another thing that I would like to bring up in this regards is configuration management. So if you consider CBTC in London, you've got the first applications by Thales on the Jubilee and the Northern Line, which is a CBTC based on induction loops that some people would call a transmission-based train control. Anyway, now the latest project that they're doing also with Thales is the four-line modernisation, which is also Thales CBTC, but with radio communication.

6:36Now, in order to sort that problem, you would probably need to have some kind of configuration management where the supplier comes in and says, well, actually the system on the Jubilee line, which is the older one might need to be upgraded to radio-based communication so that you have basically the same technology, the same system configuration for all the CBTC applications in London. So you have CBTC from the same supplier. You would assume that you get interoperability out of this, but you don't unless you do a revamp of the older systems.

7:13But who pays for that? Who is doing that? Nobody has budgeted for that. And this is something where things like obsolescence management, things like midlife upgrades of technology, they need to be planned for, they need to be budgeted for, they need to be arranged for in collaboration with the supplier. And none of these things were business as usual in the conventional signalling world, which I think is a big problem. And it comes back to the mindset of the client organisation.

7:48Everybody's talking about change management. Everybody's talking about, ah, it's not just technology. We need to focus on the people, on the process. But when it comes to the crunch, and this is one of the examples, then things just fall short.

8:03I think you're absolutely right. I think it's a broader issue.

8:08Well, let's call it configuration management. Traditionally, by the way, engineering disciplines have certainly had interface points, but they've been reasonably standalone. The civil engineering teams do what the civil engineering teams do, the signalling teams do what the signalling teams do, rolling stock do what rolling stock do. And their points of interface have been well-known and well-recognised and well-established over many years. What a lot of the new signalling technologies are doing is it's fundamentally changing the way that those interface points exist.