Greetings from Mexico! In this episode, we dive deep into a fascinating new metric called the Compute Heat Rate (CHR) and explore its potentially profound implications for the future of electricity prices and the power grid . With the explosive growth of AI, power grids are facing unprecedented demands. For example, Texas's ERCOT grid operator recently projected that load could max out at a staggering 319,650 megawatts by 2030, driven largely by data centers . We are already seeing the impact in markets like PJM, where data load growth has blown up capacity revenues to the tune of an estimated $23 billion in costs over the next three years . But what happens to the actual energy prices? That is what the CHR attempts to answer by asking: at what price would data centers elect NOT to consume power? Introduced by industry veteran Hans Royal, the CHR measures the maximum electricity price a data center operator can rationally pay before their computing tasks become uneconomic . Because AI creates enormous economic value, these data centers are incredibly inflexible and willing to pay massive premiums for power . While traditional large loads like steel or aluminum producers will typically shut down when prices hit $40 to $120 per megawatt hour , Royal estimates that AI data centers have a blended CHR of approximately 6,350permegawatthour .Forhighlycritical,just−in−timeAIinferenceservices,theymightnotcurtailpoweruntilpriceshitover∗∗53,000 per megawatt hour**! Watch to learn more about: The massive gap between AI load forecasts and grid realities . Why regulators are demanding "Flex Mosaic" and load-shifting capabilities from data centers . The difference between Large Language Model (LLM) training loads and peaky inference loads . How the incredible power density of new tech—like the Nvidia Rubin architecture, where a fridge-sized box uses the power of 65 households—could price regular consumers out of the market . If these data centers refuse to curtail power at any normal wholesale price, we could see massive localized demand supply imbalances . Watch now to understand the new metric tracking this emerging grid crisis Support the show 🎙️ About Energy Future: Powering Tomorrow’s Cleaner World Hosted by Peter Kelly-Detwiler, Energy Future explores the trends, technologies, and policies driving the global clean-energy transition — from the U.S. grid and renewable markets to advanced nuclear, fusion, and EV innovation. 💡 Stay Connected Subscribe wherever you listen — including Spotify, Apple Podcasts, Amazon Music, and YouTube. 🌎 Learn More Visit peterkellydetwiler.com for weekly market insights, in-depth articles, and energy analysis.
0:03SPEAKER_00Greetings from Mexico, where I suffer from a pretty severe head cold, but hey, you get what you get.
0:08SPEAKER_00I recently wrote an opinion piece for RTO Insider, the online news organization that provides coverage of competitive power markets, regulations, and federal and state climate policy about a new metric that addresses the interaction between AI data centers and power markets.
0:23SPEAKER_00It's called the compute heat rate, and it's such a fascinating concept with potentially profound implications for electricity price formation.
0:30SPEAKER_00I thought I would address it here as well.
0:33SPEAKER_00We all know about the astonishing growth of data centers, but just to set one's eyes popping, let's pull out the ERCOT forecast from this month.
0:40SPEAKER_00ERCOT's record peak demand was set in August of 2023 at 85,500 megawatts.
0:46SPEAKER_00The grid operator's latest forecast currently projects 2030 load to max out at 319,650 MW, which would drop down to 107,000 megawatts if large and medium-sized loads were not included.
1:00SPEAKER_00So mostly data load.
1:02SPEAKER_00And yes, admittedly, that number lives in stupid land.
1:05SPEAKER_00It's not in any way going to be possible to triple or nearly quadruple the Texas grid in four years.
1:10SPEAKER_00But nonetheless, big is big.
1:13SPEAKER_00Even if that grid were only to grow by a measly 50%, still a heavy lift, these new loads would affect power markets.
1:20SPEAKER_00We've already seen the impact of data loads on capacity prices in BJM, where a much more modest rate of load growth than that of Texas has blown up the capacity revenues with an estimated$23 billion of costs over the three-year 2025-2028 period.
1:36SPEAKER_00Too much demand, chasing limited supply, will do that to you.
1:39SPEAKER_00That's capacity.