Robot dogs are coming to America's power grid, and they're doing more than just looking futuristic. At Sacramento Municipal Utility District (SMUD), three robot dogs named Astro, Judy, and Elroy are helping inspect substations, detect equipment problems, and prevent costly failures. With more than 270 substations and 400 large transformers to monitor, SMUD is exploring how robotics can improve grid reliability while keeping utility workers safe. In this episode, SMUD's Director of Substation Telecommunications and Metering Assets, Eric Poff, explains how the utility is deploying these robots, why catching a faulty $2,000 component could save a $4 million transformer, and what it takes to turn an innovative pilot into a practical utility solution. We also explore how robot dogs could eventually patrol substations for security and inspect hazardous hydroelectric infrastructure, all without replacing the humans who keep the grid running.
0:00It's got four legs, a thermal camera, and no interest in chasing squirrels.
0:04At Sacramento Municipal Utility District, a robot dog named Astro is patrolling substations, spotting problems humans might miss, and even doubling as security.
0:13And now, it's headed to all 270-plus SMUD substations.
0:16Today, SMUD's Director of Substation Telecommunications and Metering Assets, Eric Poth, takes us inside the program and shows us what happens when robotics meet the grid.
0:25If you care about keeping the lights on and crews out of harm's way, as well as what makes a successful utility pilot program, you'll want to listen closely.
0:39So Eric, can you start by giving us an overview of this RoboDog and exactly what problem you were trying to solve when you kind of first explored these type of robotics?
0:48The problem that I was trying to solve, essentially, we have 270 substations here at Sacramento Municipal Utility District, and that requires a monthly visit to them, which is part of our general order 175 requirements for we try to comply with the California Public Utility Commission just to...
1:12Voluntarily, we're not required to do that.
1:14We just do that.
1:16And with that many substations, you're talking like 400 plus very large transformers.
1:25And those transformers are very expensive.
1:29And the lead time is very difficult to achieve these days in our current supply chain.
1:36What we were finding is even though we were physically visiting these substations on a monthly basis,
1:42We were not getting the data that we needed from the transformers to be able to prevent them from failing.
1:50We were having a rash of failures, and so we wanted to introduce a tool where we could...