Energy Capital Podcast artwork

Energy Capital Podcast · Josh Rhodes & Matt Boms

Texas competes on everything except transmission

Texas built a competitive retail electricity market: consumers choose among roughly a hundred providers, and generators build power plants at their own risk with no guaranteed return. Transmission, the high-voltage lines that move power from where it is made to where it is used, runs on a different model. One utility builds each line and recovers every cost from ratepayers, plus a return, on time and on budget or not, and faces no competition. ERCOT’s latest reserve-margin forecast goes negative in 2029 and 2030. To close that gap, ERCOT and the PUC have directed utilities to build a high-voltage backbone from West Texas to the I-35 corridor, which Smitherman puts at $33 billion, rising toward $40 to $50 billion by completion. Under the monopoly model, that cost lands on ratepayers. On this week’s Energy Capital Podcast, Joshua Rhodes talks with Barry Smitherman, the only person to have chaired both the Public Utility Commission and the Railroad Commission of Texas and now chairman of Texans for Affordable Transmission, about bidding transmission out to non-incumbents under cost and timeline caps. He sat on both commissions during the CREZ buildout, Texas’s early-2000s program that moved West Texas wind to market, and saw competitive transmission work firsthand. 00:00 - Introduction & Texas Energy Landscape 05:31 - Permian Basin Load Growth and the 765 KV Lines 12:11 - Data Center Demand: Real vs. Speculative 14:09 - Texas Energy Fund and the Energy-Only Market 21:28 - How Texas Transmission Gets Built Today 23:13 - The Case for Competitive Transmission 31:46 - The Eastern Backbone and Cost Accountability 33:54 - Private Lines and Large Load Options 43:04 - Repealing SB 1938: The Path Inside ERCOT 44:34 - Getting Transmission Right: Future Tech and Landowners This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.texasenergyandpower.com/subscribe

Jul 82026
50 minlength
973transcript lines
Publishertranscript source

Transcript first 15 of 973 lines

0:04SPEAKER_0Hey everyone, and welcome to another episode of the Energy Capital Podcast.

0:09SPEAKER_0I'm really excited today to have Barry Smitherman to talk a lot about Texas energy topics.

0:14Barry's been in a lot of different seats,

0:16a lot of different chairs when it comes to Texas energy,

0:18and I think he's got a really unique perspective in terms of being able

0:22to share what's going on and kind of what we might be looking forward to.

0:26SPEAKER_0So Barry has a BBA from Texas A&M, an MPA from Harvard Kennedy School.

0:31SPEAKER_0And is JD from the University of Texas at Austin.

0:33SPEAKER_0So Barry, like me, you are also a person internally conflicted.

0:36SPEAKER_0I also went to A&M and UT and catch no end of flack for that.

0:41SPEAKER_0But after that, he was Assistant District Attorney for Harris County.

0:44And then he's been chairman of both the Public Utility Commission,

0:47the Regulator for Electricity,

0:48and the Railroad Commission of Texas,

0:50the regulator of oil and gas,

More Energy Capital Podcast episodes →