Energy Capital Podcast artwork

Energy Capital Podcast · Josh Rhodes & Matt Boms

Inside the PUC's Cost-Allocation Overhaul with PUC Chairman Gleeson

Texas spent five years rebuilding its electrical grid based on the lessons of Winter Storm Uri. Now regulators face a harder question: who pays for the surge of large new customers trying to connect? The projections for electricity demand run far above what will actually get built, and hyperscalers want to power their data centers within 18 months, a pace much faster than the three-to-five years large industrial loads once took. ERCOT has run out of spare capacity, and the cost of building more lands squarely on residential and small-business customers if the projected load never arrives. The state’s answer is to make new load prove its intention and viability to build and pay for the grid it requires. On this episode of the Energy Capital Podcast, Matt Boms talks with Thomas Gleeson, chairman of the Public Utility Commission of Texas, the regulator who must write the rules to make that principle work. Gleeson’s North Star is SB6, the 2025 law that rewrote how large loads connect. He explains the trade-offs behind the decisions commissioners are weighing, from financial gates that screen speculative projects to a December deadline to overhaul who pays for transmission. Gleeson returns over and over again to the demand side, arguing that “the megawatt we don’t use is just as important as the megawatt that we generate.” The conversation works through: * Batch zero, ERCOT’s first round of committing firm capacity and the financial security and fee requirements, recently set at $50,000 per megawatt and meant to screen out projects that are purely speculative. * 4CP to 12CP, the proposed overhaul of transmission cost allocation, with a minimum demand charge so that large customers cannot zero-out their shares by curtailing at a few predicted peaks. * The reliability standard, a new three-part measure of how often, how long, and how large an outage Texas will tolerate. * Demand-side resources, the aggregated distributed energy resource pilot, virtual power plants and a $1.8 billion backup-power program funded through the Texas Energy Fund. How Gleeson and the commission write these rules will set how much cost current ratepayers must shoulder and which projects ever get built. Timestamps * 00:00 - Introduction and Chairman Gleeson’s PUC background * 00:48 - A new chapter for the Texas grid: from Uri reform to implementation * 04:19 - The core problem: interconnection capacity and speculative vs. real load * 08:28 - SB6 and ERCOT’s Batch Zero process * 15:10 - Large-load ride-through and performance standards * 19:18 - The reliability standard and load modeling assumptions * 23:39 - The ADER pilot: lessons and whether to scale it * 25:01 - Virtual power plants and the NRG proof of concept * 27:29 - Standardizing DER interconnection across the state * 29:20 - The backup power package: resilience for critical facilities * 32:33 - From 4CP to 12CP: reallocating transmission costs * 39:30 - Closing: taking a breath, and what the era will be remembered...

Jun 102026
43 minlength
1,248transcript lines
Publishertranscript source

Transcript first 15 of 1,248 lines

0:06Today we're very pleased to welcome back Chairman Thomas

0:10Gleason of the Public

0:11SPEAKER_01Utility Commission of Texas.

0:12Chairman Gleason was appointed to the commission and named

0:15chairman by Governor

0:16SPEAKER_01Abbott in January 2024.

0:18SPEAKER_01But his service to the state of Texas goes back much further than that.

0:22SPEAKER_01Over more than 15 years at the PUC,

0:24SPEAKER_01he has served in a number of important leadership roles,

0:27SPEAKER_01including executive director,

0:29SPEAKER_01chief operating officer,

0:30SPEAKER_01director of finance and administration,

0:32SPEAKER_01and fiscal project manager.

0:33SPEAKER_01That gives him an unusually deep understanding of the agency,

0:37SPEAKER_01the Texas electric market,

More Energy Capital Podcast episodes →