Right now, connecting a data center to the grid works like Texas hog season: no defined season, no bag limits, first-come-first-served, file as many interconnection requests as you want. Travis Kavulla’s recent essay in American Affairs argues the power industry needs something closer to deer season, with defined rounds, allocation rules, and prices that reflect what grid access actually costs. The mechanism he favors is an open season, borrowed from interstate gas pipeline regulation. Rather than processing interconnection requests on a rolling basis, a grid operator would design an engineering plan reflecting realistic demand and tender it to the market in a structured bidding process. Winning bidders receive transferable property rights to grid access, comparable to water rights or spectrum licenses, rather than vague regulatory permission that reverts to the grid operator if a project fails. That difference matters for financing: a transferable property right holds residual value even if a data center company does not survive the artificial intelligence boom. Kavulla has worked as a utility regulator at the Montana Public Service Commission, on market design at California ISO, in policy at R Street, and in regulatory affairs at NRG. He now leads policy at Base Power and teaches at the University of Chicago. The conversation also covers three other mechanisms: * Data center prepayments for discrete capital costs are, in Kavulla’s framing, the most direct fix for protecting existing ratepayers. Utilities resist them because prepayments erode the rate base growth that regulated utilities depend on for earnings. * Transmission service agreements (contracts requiring upfront financial commitment before interconnecting), widely adopted across the eastern United States, rank a distant third. They base the commitment on average embedded rates rather than actual incremental cost, which overcharges some projects and undercharges others. * Bring your own generation addresses a separate problem: demand growing faster than supply pulls the clearing price higher for all customers. Data centers that source their own capacity or pay for flexibility elsewhere ease that pressure. Utah and West Virginia are among the first states opening pathways for large loads to do this. On ERCOT, host Joshua Rhodes frames the gap: the batch zero process rations grid access but does not price it. Kavulla affirms the distinction and argues cost-of-service regulation has been stretched past its breaking point. How Texas resolves these issues will shape its next interconnection rules and what current ratepayers carry as load climbs. Timestamps * 00:00 - Introduction & Travis Kavulla * 01:59 - The Essay’s Core Premise * 03:45 - Open Season: From Hog Season to Deer Season * 08:07 - What Actually Gets Auctioned * 09:45 - Data Centers Fronting Capital, and Why Utilities Resist * 13:37 - Transmission Service Agreements and Their Flaw * 17:41 - Do Data Centers Raise or Lower...

Jun 32026
44 minlength
1,174transcript lines
Publishertranscript source

Transcript first 15 of 1,174 lines

0:04Hey everyone and welcome to another episode of the Energy

0:06Capital Podcast.

0:07I'm really excited to have Travis Cavulli here to talk about an

0:11essay that he

0:12recently wrote in American Affairs where he's the energy editor

0:15about how data

0:16SPEAKER_00centers will pay for power.

0:17It's a really hot topic right now and I'm excited to dig into

0:21that and how it kind

0:22SPEAKER_00of ties in to what ERCOT is doing for data centers.

0:26SPEAKER_00Before that,

0:26if you're in the energy nerd space like you would be if you

0:30were listening to this

0:30SPEAKER_00podcast,

0:31SPEAKER_00you probably know Travis already,