ECH Institute Podcast artwork

ECH Institute Podcast · ECH Institute Inc.

Consensus Layer Meeting 181[2026-06-25] | ACDC 181

The conversation covers updates on DeadNet 5 and the introduction of DeadNet 6, potential spec bug resolution in DevNet 7, updates on the Builder API, discussion on circuit breakers, and the consideration of EIP 768 and EIP 8080. The topics include stability, client issues, testing, decision-making, and implementation complexity. Takeaways Stability of DeadNet 5 Introduction of DeadNet 6 Addressing Potential Spec Bug in DevNet 7 Updates on Builder API Discussion on Circuit Breakers Discussion on EIP 768 Discussion on EIP 8080

Jun 252026
32 minlength
1transcript lines
Publishertranscript source

Transcript first 1 of 1 lines

Akash Kshirsagar: let's get started. So the item on the agenda is deadnet updates. ⁓ we have on the call to talk about deadnet five as well as deadnet six? Yeah, so deadnet five has been running for a few days now. It's been ⁓ three weeks now. so it's been ⁓ quite stable for ⁓ quite long time. We have a few ⁓ clients that seem to be s ⁓ struggling to range range sync. ⁓ I think Lighthouse had a range syncing bug and Prism had a peering bug. Prism peering bug seems to be resolved on DevNet 5 for now. And still was unable to sync up to head. other than that, everyone else is up to head. ⁓ And that's why decided move on with DevNet 6, ⁓ which is which just launched ⁓ a couple of hours ago and we're gonna go into ⁓ D Clos Fork in about 40 minutes. So the scope of the ZevNet is ⁓ on the spec sheet. over here. We have added pretty much all the remaining EIPs except the ⁓ Sable container one for the CL side. ⁓ nice. So this is all the EL as well as CL EIPs in this DevNet except for stable containers. Yes, that's correct. And ⁓ currently we have three execution year clients, which are Bezu, E-Trax, ⁓ Get for DevNet six and for DevNet five, I think we have all the clients. So as soon as your client is ready to be onboarded, ⁓ please let us know and then we can add you to it. On the CL side, we have all but ⁓ Grand Dean. Nice. Is there specific tests that you're looking to do over the next day or what's the general plan? So the the most important one now is that ⁓ we're gonna be doing some slashing ⁓ just before the fork and ⁓ hoping that ⁓ those validators will not get scheduled for the ⁓ following epochs. That that was also one of the EIPs that we included in the previous ⁓ DevNet already. Yeah, so there are there are three editors for now and we're gonna be doing a lot more just before defork. Awesome. That's great news. okay, so that was the next point on the agenda. So test slash ⁓ validators prefork. So yeah, Padam's already mentioned that we've taken care of that. So we should be able to see this. the next item on the agenda is a potential bug that Michaels brought up. I'm just gonna link it here. ⁓ has anyone had a chance to look at the specific bug yet? Okay. ⁓ Terrence says it's valid. ⁓ I mean I have looked at it, I'm pretty sure it's valid. I'm just waking up so ⁓ Can review more later. Yeah, of course. so I'd assume there's ⁓ be a patch for this and then a spec release, and then we can target the next DevNet on the spec release. Yeah, and we'll fix it for DevNet 7, basically. Yep. Sounds good. ⁓ anything else relating to dev nets? Well, on ⁓ Monday you wanted to a no go or go decision on seven six eight eight today. Yes, I have that in the agenda slightly after, but ⁓ yeah, I will be per I didn't see it in the agenda otherwise, so okay. The I might not have updated the latest one, sorry. ⁓ yes, I will be bringing it up in the agenda later. the next ⁓ on the agenda was relating to the builder API. ⁓ removing submit builder ⁓ submit beacon block. this from Baratz. Do we have any updates for this? Have clientens had a chance to look at it? Okay. Okay, I guess the default is to keep it if there's no ⁓ push for removal from Nico. a similar note, ⁓ has anyone started working on circuit breakers? Do want to have a push for standardization or keeping it as is and if plans implement it they do, otherwise they don't? ⁓ Terrence says they haven't spoken about thought about circuit breakers yet. Do we have other client teams and have they looked at circuit breakers on their code base? Or are we launching DevNet Six right now with no circuit breakers? I think this is ⁓ consensus like we don't we don't need to agree on this. I think ⁓ every client could come up with whatever strategy they think is best and that's gonna be good for diversity. ⁓ but do clients have the code base for some strategy today? I think there's a bunch of topics that has been discussed ⁓ especially during the interop. but yeah, I I don't think any client would have implemented this already. And I'm not sure if this is gonna be need to be ready for mainnet before we roll out. Sorry, are you suggesting we go to mainnet without circuit papers? Yeah, I mean I don't think we need all clients to have certain circuit breakers. Sure, but at least we need a majority of them to have it. Otherwise the chain would be in a broken state. Well, we could have multiple bits coming in, so I'm not so sure about that anymore. Okay. Terrence. speaking prism, we're reusing the same circuit breaker we have today for MAV boost. We just apply that, which is a simple one. You basically look at how many blocks are missed like in a row or in an epoch. I believe it was like two blocks in a row, three blocks in a row, and it's more than four missing per epoch, then we'll default the next proposal we use the local block building. So it's the same as today, but this may be prison specific. Yeah. ⁓ that I I think having the circuit breaker that you have today, working with EPBS is perfectly fine. We don't need to standardize it, but not having a circuit breaker at all feels extremely fragile. Enrico? Yes, we can hear you. Can you hear me? Yeah, we can hear you. Okay, sorry. So I we're talking about ⁓ because the the previous circuit rigates were based on beacon blocks. So now you at least you you have you it to to to count for for missing payloads, ⁓ or still yeah no no no so yeah I'm incorrect in a way that we're still using consensus blocks, so which is a little bit off, right? And ⁓ we to add that to using ⁓ like the pillow status as well. I mean we should there is no circuit breaker if the if the beacon chain chain is is working fine. Yeah, which is our implementation is more like a bug rather than so we should do something. So the the the default so the pre pre-gloss ⁓ circuit breaker doesn't really work. Yeah. Exactly. So I will apply that, which I assume it's a few lines of code hopefully to do that. Yeah, that makes sense. So will decline actually take a look at the payload as well? Or just gonna keep it ⁓ to the weekend block? We have to look at the payload. That's the right way to do it. I believe you you should not even consider the beacon block because now nowadays the beacon block should not be affected by by the payload and all the machinery around it at all. So breaker for beacon blocks goes away, and now we just have payloads reasonable. Yep. That makes sense. ⁓ this is something I would propose we should test in the future, but yeah, I agree with ⁓ Dustin's there as well. It's not as fragile as it was before. ⁓ the next item on the agenda is just ⁓ mentioned the state builder API for Glamsterdam has been merged. ⁓ that there's some amount of work being done on the builder API recently. Does ⁓ wanna speak to that? Have all clients implemented it and we're testing it to the full scale on DevNet six, or what's the plan? Yeah, turn. Yeah, we have an implementation. It's not merged into the DevNet branch yet, but Bonabers and I have been testing the latest progress is that like we got like multiplexing working, meaning that the closest to support different builders, more than one builders with their unique URL, then we're able to sign it and send the auths over, and the builders are happy they're able to verify the authorization. ⁓ And then we choose the highest bid. That's the latest progress. But I think I need to work on getting those feature merged into our main branch such that we can use it for the next defnet. Well at least the Kratosis has support and the builder has support. So client can start testing. Awesome. I would assume we have it as an explicit target for the next box so that we're also slowly reaching feature completeness. but that makes sense. ⁓ next item on the agenda was ⁓ beacon API PR. this is GLOAS proposal preferences API. ⁓ do we have James for the status ⁓ have clan teams had a look at it and left reviews? Yep. ⁓ just still waiting waiting on more reviews. ⁓ Prism has already implemented all the items in in that PR, but looking f ⁓ for review and hopefully approval. Cool. ⁓ would clients be able to provide approvals so that latest by A C D T we merged this in? Okay, thank you. any client had a look at ⁓ preactivation validator statuses and deposit in queue for post Electra or Fulu deposit pipeline? Is another API change? Yeah. Why do we want to change this? It was brought up in the agenda. I'm not a hundred percent sure. ⁓ maybe it was the wrong link, sorry. can okay, it. I will try and figure out what happened with the wrong link. in the meantime, ⁓ the next on the agenda was extending the peers API with ⁓ peer scoring and disconnect reasons. Do we have any suggestions or things to merge? ⁓ Nico, I think you were reviewing the PR. Is there any open topics there or ⁓ is it just w waiting on clients to approve it? So I haven't looked at it from the implementation, but ⁓ if people are fine with how the spec looks, I think we can probably merge it. ⁓ I think the only open question was if we wanna add the extra data field. But yeah, I think we anyway keep the V one. So we are just extending that. So I think it's fine as is probably Yeah, it sounds like extend with optional might be the easiest way to go. Could we also aim to merge this in d A C D T if nobody has any opposition? I I think it would be best if some f someone from tech who could maybe approve it. Seems like they're the only ones that looked at implementing it, so I believe Paul will take Yeah, I I I will have a text with Paul. Okay, thank you. other open API slash builder related changes for Glamstadam? ⁓ James posted James, do you want to speak for that one? Yeah, this is the new ⁓ proposer path PR for APIs. So it's introducing the get block v4 and submit block all Glamsterdam. I already gave a thumbs up on this one. ⁓ there is a separate topic regarding ⁓ of the query parameters, which is the builder boost factor. POTUS has raised an issue ⁓ on the on the I think that's gonna be a bigger discussion and I don't think this ⁓ that that should block this PR, which at least should satisfy the ⁓ self-building paths. so this includes both the stateless and stateful paths for for proposing blocks ⁓ in in I I think we just need more from teams to either approve it give any last comments. the author of the PR, ⁓ Shane ⁓ mentioned that he is he is getting married, so he is out of office until July fourth. so we will have to ⁓ take over if we want changes before that. Or or just do it in separate PRs. Would ⁓ clients be able to review by A C D T and then we can get that merged async? But yeah, I agree. I think this is something we should test earlier rather than later. And then we can talk about inclusion for the next step. Yeah, if you said there's a lot of beacon API PRs, it would be nice if we can clean this up for ⁓ o over the next days. ⁓ yeah, and the message from PK is that we should probably margin the end points are already in use. ⁓ there's also a simplify payload attributes event that that's been linked here ⁓ from ⁓ And yeah, I'm ⁓ probably the same instructions as before. I think it would be good to have people review this and hopefully by ACD T we get it merged in and we can schedule all of these for DevNet 7, especially if they're breaking changes. Okay, ⁓ anything else for API or builder related topics? Okay, let's move on to EIPs. ⁓ so ⁓ for Glamstadam, the first one is ⁓ EIP seven six eight eight. floor is yours, Etan. Yes, Monday we ⁓ ACDT and we wanted to decide whether to include or not include seven six eight eight into like the scope like SFI or DFI and ⁓ was this plan to do this go no go decision today and I guess it would be good if every client team could just ⁓ Provide their views and how far they are with the implementation. So yeah. ⁓ yeah. So SFI would have to wait until it's the devnet, but we can make a decision if it's DFI or not DFI essentially. ⁓ and then talk about including it in the next DevNet. but for that one, it would be extremely important to get client team ⁓ voices. Have teams ⁓ into implementations? I I'm just going to go ⁓ step by step. So ⁓ yeah, came in from Lotestar says they have an implementation, Nimbus has an implementation, Grandine doesn't, Lighthouse does, Teku and Prism. What about you guys? we are on it. ⁓ not completed, be POC POC like implemented ⁓ soon but ⁓ it will require a little bit more work to improve cause I got some ⁓ some ⁓ doubts ⁓ what happens on the transitions when we need to translate attestations ⁓ on on on when when when things have when when fork ⁓ when fork activates ⁓ need to also double check all the potential performance regressions so yeah it's It's on the way. Do you think it's a sizable list for Deadnet seven? Or ⁓ do you feel like it's in a scale scope of possibility? Like are you starting fresh or is this a working you just need some time to refine? yeah, needs to be complete. It's not starting fresh because we had ⁓ previous implementation on the early ⁓ prototypes for previous version of this of the EIP. But the point is that this this very last version of the EIP introduces the ⁓ the progressiveness in various other places and ⁓ even in places where we were not very prepared to change the type there. So the radius blast blast int ⁓ taco side is pretty yeah, touches places where we were not touching previously. Okay. And has this already been taken into account in the other implementations? Lighthouse or Prism, for example? Have you guys already the implementation mostly there ⁓ where are you guys at with it? Prism Prism ⁓ has we've updated our code generator. So we're generating ⁓ virtualization code that passes Etons ⁓ spec test fixtures. ⁓ like like ⁓ you know, we had to deal with ⁓ all of the fields That are becoming progressive lists in different places. So that that that took a bit of more changes on the on the code generator. ⁓ but ⁓ there's some other nuances like the ⁓ what to do with attestations of the transition. That's something that that we have flagged as well to figure out. and ⁓ there they're details to work out, but ⁓ we have you know the kind of the hardest part of the implementation ⁓ figured out, so we feel good about it. Okay. ⁓ that sounds it's promising then. ⁓ so ⁓ we get a go no go from all clients? Would you guys be ready to spend the time to schedule this for DevNet seven? Or would you feel like it's too big a lift? There's a there's other priorities or there's builder related work that needs to be done instead for DevNet seven. could we go client by client? ⁓ the when is DevNet seven is an open question, of course. ⁓ it depends on DevNet 6 stability, but let's try and target two to three weeks so that we can slowly start hitting production level code and then ⁓ scheduling test nets. ⁓ Nimbus says they're okay. what about the other plans? Lodestar, yes. Okay. ⁓ Casey, would that be a yes from Fism or is that a maybe? yeah, I would say I would say it's ⁓ it's a it's a weak yes and a strong maybe. Okay. Yeah, the same for us. I mean the the amount of work that me needs to be needs to be done on the API side and the builder flow on on TECO side is still pretty big. So this adds up on ⁓ the ⁓ current workload and ⁓ yeah. Okay, we are it's it's not a no, but it's ⁓ it's a yes, ⁓ hopefully. I I I do also want to throw in that I think this is somewhat unique terms of our, you know, DevNet merge philosophy that we've had in the past, ⁓ where it would be easy to pull this out at the last minute. It's like not interacting with other things in the fork. so I feel okay about, you know, ⁓ saying like let's go for it. And then if we get DevNet seven and we have other things we need to test and we need to pull this. ⁓ ⁓ you know, as long as we have another DevNet ⁓ to to test it, ⁓ it it seems too risky. Well, I I I'd push back into the easy ⁓ of it because when you have to deal with all the types changes inside the code, ⁓ then start removing everything. So it's pretty invasive in certain areas, at least for for for us. Okay, yeah, that's fair. That's yeah, that's very implementation specific. Okay. ⁓ it seems like we're at an even split. We have ⁓ three clients that's a yes, three that are a maybe. to me sounds like there's ⁓ one that's a strong no. So it we wouldn't DFI this today. And we should probably target it for DevNet seven. And then if it feels like it's too big a lift for DevNet seven, or it feels like there's a lot of other bugs that have been showing up on DevNet six. then we can revisit this the decision and then DFI it ⁓ later on. Does that sound like a fair outcome? So stable state, everything goes well, it goes in the next DevNet. If it feels like it's too big a lift, if it feels like we're finding a lot of other bugs, in that case, we ⁓ we don't include it in DevNet 7. Okay. else for progressive containers or are we ⁓ all aligned on the topic? It's good. ⁓ just have to set the expectation that it's included, like in DevNet 7. Yes, I mean unless something drastically breaks in DevNet six and we need to change the spec ⁓ by a big amount, yes, we should sprint towards it on DevNet seven. Yeah, thanks a lot. Okay, next EIP to discuss is EIP 8080. ⁓ we had ⁓ signaled intent to DFI this EIP. is any reason to not DFI it? ⁓ Have got some more time to look into it and want to revisit the decision? the main reason for DFI was that in the past, ⁓ it seemed like it was a lot of implementation complexity. Okay. then we will move EIP eight zero eight zero ⁓ to DFI. sorry, do want to say something about the EIP before we go ahead? Yeah, sure. ⁓ yeah. ⁓ I'm absolutely aware how ⁓ complex the implementation At a glance, it looks like it shouldn't be complex, but ⁓ the devil is the detail always. In general, I want to say that this concern with the ability to utilize consolidation queue for faster exits when the exit queue is clogged is a pretty problem ⁓ on application layer for staking providers because how to s how to properly frame that. A few providers have all have previously indicated that they are using it, even though this ⁓ is an intended behavior. But ⁓ like recently, when they were closing their solo staker program, they were using consolidations to exit their solo validators ⁓ by simply consolidating all of them to one thing. I think before being acquired by ⁓ Maven, Pier 2 made a big announcement that they are even selling it as a product feature. which is in general, like it's not great that we have this duality where you have two ways of effectively exiting the stake, when one of these ways is definitely not meant to be done this way. So, like if there is a chance that we Can include this EAP, that would close a very unfortunate gap that we have in the consolidation specification. And is more important ⁓ that there will be no chances again of some players ⁓ like having an an unfair disadvantage compared to the others. Because the simple thing here is that ⁓ if you are building a ⁓ like a reasonable DeFi application without a multisig controlling it, you to to utilize this feature, you need to have a specific implementation for that. while non-protocols like operators or just shady protocols that are managed by multisig have an unfair advantage of being able to use that. And in my ⁓ it's not the like the best situation when we are giving an unfair advantage to those using not the best security ⁓ practices and the protocol building practices. Yep, I think the intent and motivations for the EIP are ⁓ are clear. I don't think anyone was even particularly against the EIP. ⁓ most of the pushback was purely around ⁓ implementation complexity, as well as Glamsterdam already being a massive ⁓ fork where even today we just added another big feature to it. so I think the pushback was mostly around implementation complexity and time. However, that being said, since there's no fundamental reason why anyone's opposing this and it is a gap that's what's ⁓ plugging in the future, we still have the Hegota non-headliner window open. So I'd suggest that the authors repropose for Hegota, and then this is something we can still solve in the future. So I will be just curious to listen from someone what is the implementation complexity because you know, I ⁓ I was involved on ⁓ finding this kind of bug in the specs of ⁓ consensus layer and it seems that D C A P is just updating one function, so it's not really a big change in my opinion. So I was just wondering like did ⁓ during testing or implementation ⁓ like corner cases appeared or ⁓ like ⁓ how did this ⁓ complexity arises as an as a factor here. I have to check ⁓ ⁓ I think we have to check the forecast transcript to see which EI ⁓ which A D we spoke about this probably ⁓ the C D's in the past. do any client teams have specifics that we can bring up today? Okay. ⁓ I think we might have to just dig up the transcript and then get back to you on that, Greg. Is that okay? Thank you. ⁓ the next item on the agenda was ⁓ EIP eight zero four five, ⁓ exit slash validators from proposing. ⁓ so ⁓ I think the open agenda item was was a presumed PR and if we can SFI this EIP now. Do we have portals on the agenda? At least my notes say that were waiting on something there. I thought this is already in the devnet. Yeah, this is already in DevNet. Okay, so it was just about moving into SFI status. Okay, got it. Thank you. Technic technically speaking, it is worth waiting for the actual fork to happen on DevNet and then to see that it works. ⁓ but it's already on devices. It's not on the text. This was already included in the previous dev not. Okay, got it. Sounds like I just had some stale information. we have an update on A2A2 execution requests? It's gonna be tested on level six eight minutes. I give an update if there's no one else from the guest team here. Yes, please. ⁓ so ⁓ one thing that is broken with this is the queuing mechanism. ⁓ same as the other contracts, ⁓ but this one is a bit more severe. what Felix ⁓ now implemented a new version that updates the fee every time someone is added to the queue, not on on every block. that means that fees might be a bit higher, but we don't have this this case where we where you can enqueue a lot of validators into the the a lot of builders into the ⁓ into queue or the execue. And then the the ⁓ the fee is updated into infinity. ⁓ so ⁓ yeah. A new version of the contract should be out already. ⁓ that one is strictly better than what we have right now. And the old version is being tested on ⁓ Bell DefNet s ⁓ six, ⁓ which is good. ⁓ so we can test the workflow, we can ⁓ if all the plumbing is ⁓ is correct, and then ⁓ for deaf net seven we we should probably update the contract. yeah, otherwise What we also want to do is have internal reviews and external reviews the contract. ⁓ because this change is not big, but it does update the logic of the contract. yeah, I think that's for eighty two eighty two. Awesome. Thank you. ⁓ yeah, Nico? Yeah, just one more update which also relates to updating the contracts. ⁓ so it would be indefinite seven. Which is we might wanna tweak the values we currently use for deposits. ⁓ it's currently thirty-two the target and two fifty-six is the max. And I think we should reduce that to eight and sixty-four. that would allow us to further reduce the r withdrawability delay for builders. So currently it's I think set at eight thousand one hundred and ninety-two epochs. And we can with eighty to eighty two we can safely reduce that again to at least sixty-four, what we had previously. but I think we can further reduce this ⁓ if we adjust the contract constants to like eight epochs or even lower, because there's no DOS risk anymore. so this would ⁓ make the UX for builders a lot better, as they can more quickly ⁓ withdraw their money if they need to. So potentially they can stake more Eve that way and compete more on high value bits and use thrustless payments. So that would be the main argument to do this. Thank you. would a combination of Nico, Marius, or potentially the authors let us know when it's in the final state because we would still have to organize an audit for the final contract. that can happen in parallel of course, but still ⁓ it would be useful to have a have a signal that it's in the final state. we can just add it to the agenda on every A C D and A C D T to check in so that we get it in a three day cadence ⁓ know when everything's final. Yeah, I would probably defer this to Felix or Matt ⁓ to talk about when the contracts are in a final state. Maybe they are already. ⁓ the change from my side would only be adjusting two constants, basically, which should be minimum. Yes, but we'd still want to wait until ⁓ everything's final, including the constants, ⁓ before we send it out for the audit. I yeah, I think that that one definitely, yeah. Okay. you. ⁓ yeah, Marius? No, I just wanted to say I happy to check in with my team members on the on the status and we can go ahead with the conference and and what when we I guess the definite stage for the orders. Okay, perfect. any other glam sedam related topics? do we want to do the dynamic ⁓ size or no on the contract? Dynamic queuing that ⁓ Piki raised ⁓ maybe two weeks ago regarding A282? That probably would make sense if we are not sure ⁓ about the ⁓ DQ rate. Like we are still guessing if two hundred sixty five, ⁓ fifty six or sixty four or what or whatever. That way we could change it after the for after the fork by a future fork without ⁓ doing a irregular ch change on the contract. 'Cause when we hard code it and deploy it, we can't change the contract anymore. ⁓ is this captured as a comment or a PR to the EIP or somewhere that people can discuss this? Okay, ⁓ if not, then maybe you could open up PR so people have the exact changes in my MPK. Okay. ⁓ yeah, and comment from Marius was that it sounds a bit brittle. Cool. ⁓ any other EIP discussions for Glamsterdam or Glamsterdam chop ⁓ topics in general? Anything clients are having trouble with or want to ⁓ flag today? Okay, perfect. move on to Hegota then. There's one point on the agenda. It's that ⁓ we still have our Hygota non-headliner window open. for now we're still looking for when the last date would be before the ⁓ before the window closes, but for now it's open and I just wanted to announce that. any other Higota related topics? We still have some time or so if there's anything fossil related or else that plant teams have been working on ⁓ for Hegota, then we can discuss that now. Okay. ⁓ Justin mentioned that Lucil needs some Lucid needs some CL oversight. Yeah, can I do a plug real quick since we got some time? Sure. You have the next few minutes. Real quick, ⁓ Lucid is ongoing. I'm working on execute execution layer specs for it, but I don't know what goes into good CL level specs. So if anybody is interested, we could use some advice and some guidance on how to not embarrass ourselves when opening you know, CL specs, changes to the to the Python stuff, et cetera. So if this is something that you can help us out with, if you can take a look at what we're doing and tell us that we're crazy or give us a little bit of guidance, that would be super appreciated. reach out to me or anybody else involved with encrypting the mempool. Thank you for coming to my TED Talk. Love you all. I can help with that by the way. ⁓ I'll reach out. Justin Power, thank you, bud. Thank you. if there's no other topic, then I do want to mention that we're ⁓ currently having our vote for what the Glamsterdam mascot should be. So please remember to drop your vote. And being said, that's it for ACD 181. See you guys in two weeks. ⁓

More ECH Institute Podcast episodes →