Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction. No hype. No futurism. Just execution reality. Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models. This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do. Topics...

126episodes
2025first episode
Severalepisodes a week
4 mintypical episode

Latest episodes

  1. Episode 127: Mass Timber's 20% Annual Growth and What It Actually Means

    Mass timber construction in the U.S. has posted roughly 20% annual growth since 2015, crossing 2,500 buildings built or in progress. RedBuilt is advancing...

    4 min
  2. Episode 126: Suffolk's Contech Stack on Gilead's $847M Campus

    Suffolk Construction has wrapped Gilead Sciences' new research center in Foster City, California — a facility tied to an $847 million campus expansion — and...

    4 min
  3. Episode 125: Villa's New CEO and the Chassis Rule Shift

    The 21st Century ROAD to Housing Act's permanent chassis removal for manufactured homes is now moving toward HUD implementation, and offsite builders are...

    4 min
  4. Episode 124: Trimble's AI Push: Drones, Scheduling, and Document Risk

    At its annual Dimensions conference in Las Vegas, Trimble debuted WorksManager Drone for cloud-based photogrammetry processing, rolled out agentic scheduling...

    4 min
  5. Episode 123: HITT Breaks Ground on NASA's $300M Johnson Space Center

    HITT Contracting, the eighth-largest U.S. contractor by revenue, broke ground on NASA's Applied Spaceflight Fabrication Facility (Building 70) at Johnson...

    3 min
  6. Episode 122: Minnesota's First Modular Holiday Inn Express Opens

    RISE Modular has completed the Holiday Inn Express & Suites in Alexandria, Minnesota — the state's first modular Holiday Inn Express and the company's fourth...

    3 min
  7. Episode 121: Amazon's Mass Timber Logistics Prototype in Elkhart

    Amazon's D115 Net Zero Delivery Station in Elkhart, Indiana just earned ENR's 2026 Midwest Best Project award for Sustainability — and it's more than a...

    4 min
  8. Episode 120: Voters Reject Data Centers Across 10 States

    Last Tuesday's election sent an unmistakable message to data center developers and the local governments that have been greenlighting their projects: the...

    3 min
  9. Episode 119: ATCO Expands Modular Manufacturing in Ontario

    ATCO Structures has officially opened its expanded modular manufacturing facility in Grimsby, Ontario, marking a significant fixed-asset commitment to...

    3 min
  10. Episode 118: By-Right Permitting: Modular's Entitlement Unlock

    Modular construction has largely solved the manufacturing problem — factory-built is faster and more cost-predictable than stick-built. But modular...

    5 min
  11. Episode 117: U of Maine's 3D Bio-Home Factory Goes Large

    The University of Maine's Advanced Structures and Composites Center is nearing completion on a nearly $82 million, 50,000-sq-ft mass timber facility in Orono...

    5 min
  12. Episode 116: An NFL Facility Built in Under 3 Months, Modular

    WillScot's Senior Director of Fleet Operations, Sven Louis, broke down how the company delivered a fully operational NFL facility in under three months using...

    3 min
  13. Episode 115: UC Riverside's $299.6M Prefab Housing Win

    The UC Riverside North District Phase 2 student housing project — a $299.6 million, 1,568-bed development delivered by McCarthy Building Companies — earned...

    4 min
  14. Episode 114: Holtec's $2.1M Whistleblower Verdict and SMR Stakes

    A New Jersey jury awarded former Holtec International CFO Kevin O'Rourke $2.1 million on October 21 after finding the nuclear developer retaliated against...

    4 min
  15. Episode 113: Prefab Interiors and the Schedule Compression Play

    Interior construction is consistently the slowest, most change-sensitive phase of a building project — and the conventional recovery tools are running out of...

    4 min
  16. Episode 112: Meta's $6.6B Research Credit Fight

    Congress is pressing Meta over $6.6 billion in federal research tax credits claimed from 2023 through 2025, questioning whether expenses tied to constructing...

    5 min
  17. Episode 111: Icon's $200M Series D and the Titan Machine

    Icon, the Austin-based large-scale 3D printing construction company, closed a $200M Series D co-led by Baillie Gifford and BlackRock. The raise funds...

    4 min
  18. Episode 110: DPR's $230M Prefab Kaiser Permanente Build in Colorado

    DPR Construction broke ground on a $230 million Kaiser Permanente medical office facility in Westminster, Colorado — and the build is running prefabrication...

    3 min
  19. Episode 109: HUD Bets on Factory-Built Multifamily

    HUD has tapped the National Institute of Building Sciences (NIBS) and modular advisory firm MOD X to run a yearlong initiative addressing the persistent...

    4 min
  20. Episode 108: HUD's 7-Step Plan to Modernize Manufactured Housing Code

    HUD released its "Next Generation Manufactured Housing Action Plan" this week — a seven-step roadmap for rewriting the manufactured housing code to comply...

    4 min

Showing the latest 20 of 126. Every episode is in the API: GET /v1/podcasts/pod_3fc1c4xmqcbehsabt86x3pwy98/episodes

More business podcasts →